Skip to content

Repetitive or Continual in Nature

Enhancement of the primary cycling infrastructure: The extension of the East-West axis (Bilker Allee - Oberbilker Allee) within the main cycling network is slated for approximately 1.7 kilometers this year.

Unwavering, Steadfast, Persistent
Unwavering, Steadfast, Persistent

Repetitive or Continual in Nature

In the heart of Düsseldorf, the bustling district of Bilk and Unterbilk is set to witness a significant change with the reactivation of the bike path on the side area up to Huttenstraße. This is just one of the many measures aimed at enhancing cyclist safety on Oberbilker Allee, a notorious accident hotspot.

The renovation of Bilker Allee will be undertaken in several stages, starting with the planning and design phase, followed by public consultation, and finally construction. The construction phases will involve surface renewal, marking, and installation of safety features to ensure a smooth and safe cycling experience.

The new bike paths, marked on both directions of Bilker Allee, are welcomed by the ADFC, the General German Bicycle Club Düsseldorf. Jan-Philipp Holthoff, a board member of the ADFC, believes these new bike paths will be a breakthrough for cycling in Bilk and Unterbilk.

Parking options on the right-hand driving lane, where the parking ban has been lifted up to Huttenstraße, will no longer be available. However, parking on weekdays will be allowed on this section. It's important to note that the restricted parking ban only applies on weekdays.

Four new loading zones with time restrictions from 7 am to 8 pm have been set up on the section between Corneliusstraße and Gustav-Poensgen-Straße. The section between Bilker Church and Talstraße has a speed limit of 30 km/h.

The traffic light system at the Bilker Church intersection will be renewed, and the accident hotspot Bilker Allee/Benzenbergstraße will be initially redesigned with red-marked bike crossings.

The measures on Oberbilker Allee are a response to the documented accidents, especially those involving forced evasion with a bike over the centrally running tracks. The ADFC believes that a bike lane is necessary on Oberbilker Allee to address these accidents.

The new bike paths are expected to be finished by mid-December, with provisional bike lanes already marked on Bilker Allee. For precise and updated information, checking local government or city transport department announcements regarding Bilker Allee bike lane renovations would be necessary.

In conclusion, the renovation of bike lanes on Bilker Allee marks a significant step towards improving cyclist safety in Düsseldorf. The measures are designed to provide a smoother, safer, and more enjoyable cycling experience for residents and visitors alike.

The redesign of Bilker Alley will also involve the automotive industry, as electric charging stations will be installed in strategic locations along the new bike paths.

To further promote sustainable transportation, the city government is considering collaborating with local finance institutions to provide incentives for the purchase of bicycles and electric vehicles.

The public-transit industry is also expected to benefit from these changes, as increased bike usage may lead to a decrease in congestion, thereby improving the efficiency of the city's public transportation system.

Read also:

    Latest